Skip to content

Camlok Pile Pitching Clamp 3T WLL 26mm Slot Ground Release Rope For Fast Safe Pile Handling Contractors

SKU CP3
Sale Sale
Original price $2,167.00
Original price $2,167.00 - Original price $2,167.00
Original price $2,167.00
Current price $1,987.00
$1,987.00 - $1,987.00
Current price $1,987.00
Availability:
in stock, ready to be shipped

Standard shipping

Estimated delivery time: 2-3 days

Camlok CP Pile Pitching Clamp – 3.0T WLL, 26mm Slot, Ground-Release Rope

Designed for fast, controlled pitching of sheet steel piling on busy jobsites, the Camlok CP Pile Pitching Clamp combines robust handling with safer, ground-level release. With a 3.0-ton working load limit and a 26mm slot, this clamp delivers a secure grip on a wide range of standard sheet pile profiles while simplifying repetitive placement cycles for onshore and marine projects.

Key features at a glance

  • Working Load Limit: 3.0 tonnes (WLL) for dependable performance on common piling tasks
  • Slot Size: 26 mm, compatible with standard sheet pile dimensions
  • Ground Release Rope: 15 metres included for safe, ground-level disengagement
  • Standard Shackle: ready to connect to lifting gear without additional accessories
  • Specialist Use: precisely designed for pitching sheet steel piles; not intended for extracting driven piles

How it works

Attach the CP3 clamp to the pile, lift to the desired height, then disengage from the ground using the integrated 15-metre release rope. The result is smooth, repeatable placement with fewer trips up and down the structure, helping crews maintain momentum while upholding safety standards. The 26mm gripping slot ensures a secure hold across common pile profiles, while the built-in shackle provides immediate compatibility with cranes or hoists.

Why this Camlok CP3 stands out

  • Purpose-built for pitching sheet steel piling, delivering rapid, reliable placement in challenging site conditions
  • Ground-level release reduces manual handling and speeds up workflow, a key advantage on tight jobsites
  • Rigid 3.0T capacity covers a broad range of standard pile sizes, minimizing the need for multiple tools
  • Integral rope and shackle streamline setup, enabling quick hook-up to lifting gear

Ideal applications

  • Site piling for temporary cofferdams, seawalls, or retaining structures where quick, repeatable placement is critical
  • Onshore and marine construction projects requiring reliable pitch-and-release operations
  • Operations prioritizing reduced manual handling and smoother placement cycles on busy sites

Safety, compatibility, and best practices

  • Use only within the 3.0T WLL rating and 26mm slot specification; not suitable for extracting driven piles
  • Verify pile profiles before use to ensure optimal grip and safe operation
  • Follow site safety procedures for lifting gear and ground-release systems

What’s included and shipping

  • CP Pile Pitching Clamp (Model CP3)
  • 15-metre ground-release rope
  • Standard shackle for immediate integration with lifting gear

This item ships directly from our supplier network. For any regional availability or delivery timing questions, please reach out to confirm options. Product No. CP3F - 23.12.2118.27 ensures you’re receiving the exact CP3 model tailored for sheet steel pile pitching and ground-level release.

Practical tips for best results

  • Before each job, inspect the 26mm slot and gripping surfaces for wear or damage
  • Ensure the release rope remains free of knots and obstructions for reliable ground release
  • Pair the CP3 with compatible lifting gear using the included shackle to minimize setup time
  • Store the clamp in a clean, dry area to preserve the integrity of the rope and moving parts

Brand note: Brought to you by HES NZ LTD, a trusted provider of high-performance lifting clamps and hardware accessories designed to meet demanding construction standards.

Request a quote
NZ wide shipping
Warranty Info

Offering a range of policies

Need Help?

Contact our support team today