50kg/10g Travel Luggage Scale
Not Available for Pickup under any circumstances, send direct from independent dropshipping Warehouse
(Inc. GST)
50kg/10g Portable Travel LCD Digital Hanging Luggage Scale Electronic Weight
Descriptions:
Engineered with the latest generation of sensor technology, the Camry Digital Luggage Scale provides ultra precision to ensure accurate weighing.
At only 3.2 ounces, this scale is easy use and convenient to pack along on your trip.
No more hassles at the check-in counter; save your hard-earned money and travel with peace of mind and confidence!
Product Features:
Capacity: 110 LB/50 KG, Division: 0.1 LB/50 G, Unit: LB/KG.
LCD display with Room temperature With rubber paint handle so that you can carry with ease.
Zero and tare function, Low battery/overload indication.
Power:1 x 3V Lithium Cell CR2032 included.
Thermometer temperature sensor in both F° and C°. Know your delicate luggage is in an ideal climate.
Traveler Design: Durable and heavy duty to stand the test of time and travel. Portable and easy to store at home or in your suitcase.
Tare and auto-off functions included to preserve both time and energy.
EASY TO USE: lb/kg, °F/°C conversion units, data lock and tare functions at your fingertips.
Specification:
Device Type:Lugggage Scale
Measurement Unit:LB / KG
Max Weight:110 LB / 50 kg
Graduation:0.02LB/10 g
Display Size:1.44 Inches
Backlight:Yes
Temperature Display:Yes (°F/°C)
Batteries:One "CR2032" Included
Color:Silver
Package Includes:
1 x Portable luggage scale.
1 x CR2032 battery.
1 x User Manual.